ECOLOGICA NAVIGLIO Spa

Year
2018
Location
Robecchetto c.I. (MI)IT
Scope of Work
Up-grade
Industry
Sewage treatment plant
Activity
Basic engineering
Objects
Process & Combustion Control System
Technical Description

Thanks to its know-how, W.T.E. was selected to deliver the study of the new control system of the existing sludge drying  plant to improve safety procedure switching from originally manual operation to an automatic one.
W.T.E. also provided the related HAZOP through process analysis and management interviews.

Basing on a suitable mathematical model, automation procedures were simulated in order to control and monitor:

  • fumes recirculation fan;
  • scrubber cooling system with indication of the fouling trend in the  heat exchanger;
  • consumption of drying drum motor;
  • capacity of sludge.

Concerning water treatment, the activity realised also included:

  • engineering of  P&IDs;
  • study of the automation logic of the sludge dewatering centrifuge washing;
  • study of the automation logic of the cooling system;
  • editing of the new logics and their integration into existing documents.

Want to know how we can support your project?

We’re always ready to listen to new ideas, take on new challenges, and find customized solutions together.