AGSM AIM s.p.a. (2023)

Assignment for the design of a system for the drying of organic sludge (110,000 t/y) and their combustion to be implemented within the area of the old waste-to-energy plant located in Ca’ del Bue.

Investanas JSC (2023)

Investanas JSC (Vilnius) has assigned W.T.E. Waste to Energy Srl to design a complete incineration plant, including the basic and detailed design of a furnace-boiler system (tail-end type), a flue gas cleaning system, a fly ash handling and storage system, and all other auxiliary systems. Main data: 11,5 MWth capacity 100 % MCR; LHV from […]

A.AM.P.S. SPA (2022)

Support and direct drafting of all the documents required by law in order to obtain the review of the authorisation (A.I.A. Italian document) of the operating WtE plant (expertise, review overhaul and complement of documentation, compliance with the BAT). New design of the pumping station of the water feeding system.

LEDOGA SRL – Gruppo Silvateam (2021)

The basic engineering of a new CHPP 4MWt+3MWt was to include the study of the energetic optimization of the thermal sources available to the company and the project of the distribution of the heat within theinternal industrial network.

SIA V.L.K. (2018)

After an international public call for tender issued by Ventspils (LV) Authority, W.T.E. had assigned the job with the title: “Development of a construction design and technical specifications for the procurement of design, construction and supply of equipment within the boundaries of the project titled “Installation and Operation of a Refuse-Derived Fuel Regeneration Plant at […]

INDUNOR- Silvateam Group (2018)

Silvateam Group is an Italian holding, world leader in the production of plant base extracts, since 1854. The job assigned included the study of biomass boiler revamping to improve steam characteristics and combustion, a new thermal cycle, a new gas cleaning system and a new biomass drying system.

PRIMA SRL – Falck Renewables Spa (2018)

A major Italian company, operating in the field of incineration and renewable energy, required W.T.E. to study the life extension of boilers installed on an existing incineration plant. Later, the analysis was extended to the whole plant. W.T.E. carried out the study for residual useful life evaluation through an analysis of ordinary and extraordinary maintenance […]

Eco Research (2017)

W.T.E.signed a contract with Eco research for the whole design and supply of a pilot plant, realized with moving skids, to test the HTC process. W.T.E realised this prototype basing on its own conceptual design for full-scale test. The HTC pilot plant consists of several packages which allow the slurry to be handled in safe […]