MASCIONI SPA (2024)

The Owner of a textile industrial firm needs a feasibility study of a new boiler and its gas cleaning system. The CHP installed and operating giving power to the production process is fed by biomass; W.T.E. was appointed to enhance the performances of the combustion and of the emissions of gases consequentlly. The study offers […]
YARA Environmental Technologies GmBh Italian Branch (2021)

Consulting to get INAIL approval for the revamping of the pressure parts modification of three utility boilers installed on the Ilva steel mill plant (Taranto) in the ambit of the delivery of three new gas cleaning systems.
VENTSPILS SILTUMS (2014)

SIA Ventspils Siltum, Multitutility of Ventspils City (Latvia) is in charge of managing the urban district heating. In 2014 Ventspils Siltum commissioned W.T.E. to carry out the technical-economic feasibility study to revamp an existing furnace-boiler, originally designed to be fed by coal following Russian technology. To reduce coal consumption W.T.E. studied the conversion to RDF […]
EDIPOWER SPA – Gruppo A2A (2013)

Feasibility study to convert a furnace, fed by diesel oil, to RDF (Refuse Derived Fuel), throughput 150 MWe. W.T.E. designed a mathematical model based on characteristics of existing boiler and suitable to describe air suspended fuel burning and energy recovery in combustion chamber. Reduced steam thermodynamic parameters were assumed in order for the boiler tubes […]
ATZWANGER SPA (2011)

W.T.E. was appointed to carry out expediting, quality control and engineering review for the new fired boiler, 60 MWth of capacity, to be installed on the MSW incineration plant in Bolzano. The boiler was mainly manufactured in India.
MASCIONI SPA (2010)

Mascioni S.p.A. (Cuvio-VA), an important Italian yarn-dyeing factory, appointed W.T.E. to design and engineer the way to substitute coal for PKS (Palm Kernel Shell) and dried sewage sludge in its 50 MWth boiler. The boiler had to deliver superheated steam (455 °C e 64 bar) to a co-generative thermal cycle, including a new full condensing […]
TOSSILO SPA (2010)

Modifications of existing lines, with installation of booster fans. W.T.E. was ordered to deliver a feasibility study of the upgrade of booster fans allowing the discharge of combustion fumes, one fan for each line of the incineration plant with fluidised bed technology in Macomer. In the project the new fans are placed before the existing […]
