AGSM AIM s.p.a. (2023)

Assignment for the design of a system for the drying of organic sludge (110,000 t/y) and their combustion to be implemented within the area of the old waste-to-energy plant located in Ca’ del Bue.
ASA Azienda Servizi Ambientali (2019)

After a preliminary study to evaluate the co-combustion of sludge sewage and RSU-RDF in the incineration plant, W.T.E. was appointed to analyse in details the energetic performance of the plant. The aim was to verify the compliance with law and rules in force, focusing on energy recovery. The client, A.S.A.core business focuses on management of […]
ECOLOGICA NAVIGLIO Spa (2018)

Thanks to its know-how, W.T.E. was selected to deliver the study of the new control system of the existing sludge drying plant to improve safety procedure switching from originally manual operation to an automatic one. W.T.E. also provided the related HAZOP through process analysis and management interviews. Basing on a suitable mathematical model, automation procedures were […]
