BEA-SPA (2025)

W.T.E. is committed to study and project a new gas recirculation system to up grade the existing the combustion control system.

Investanas JSC (2023)

Investanas JSC (Vilnius) has assigned W.T.E. Waste to Energy Srl to design a complete incineration plant, including the basic and detailed design of a furnace-boiler system (tail-end type), a flue gas cleaning system, a fly ash handling and storage system, and all other auxiliary systems. Main data: 11,5 MWth capacity 100 % MCR; LHV from […]

MASCIONI SPA (2010)

Mascioni S.p.A. (Cuvio-VA), an important Italian yarn-dyeing factory, appointed W.T.E. to design and engineer the way to substitute coal for PKS (Palm Kernel Shell) and dried sewage sludge in its 50 MWth boiler. The boiler had to deliver superheated steam (455 °C e 64 bar) to a co-generative thermal cycle, including a new full condensing […]

TECNOCASIC SPA (2004)

TECNOCASIC had to realise the revamping of MSW incineration plant located in Cagliari neirbourough in order to comply with environmental Italian law. Main sections of plants were replaced after new design of all the system. W.T.E. was required to deliver the basic engineering, thermodimanic calculation of new process, and detailed engineering for the reconstruction of […]