Eco Research (2017)

W.T.E.signed a contract with Eco research for the whole design and supply of a pilot plant, realized with moving skids, to test the HTC process. W.T.E realised this prototype basing on its own conceptual design for full-scale test. The HTC pilot plant consists of several packages which allow the slurry to be handled in safe […]

AEM Gestioni Srl (2011)

W.T.E. obtained the contract for a major revamping of the MSW incineration facility owned by AEM Gestioni Srl, now a partner of A2A. The object of the tender was design, supply, install and start-up of: high Dust SCR DeNOx unit, installed downstream of an existing SNCR system insertion of a second boiler downstream first, in […]

ECOSESTO SPA- Falck Renewables Spa (2009)

Ecosesto SpA, coordinated by Actelios Spa, ordered to W.T.E. the design and the supply of a superheated steam boiler and auxiliary equipment for a power plant, located in Rende (Italy), fed by wood chips and olive residues. The plant was undergoing a complete revamping system in order: to increase efficiency of energy recovery and to […]

STC Srl (2007)

Design, manufacturing, supply start up and commissioning of a 24 MWt furnace fed by wasted biomass (wood chips, wine production waste, straw, kernel and stones), including auxiliaries and Process & Combustion Control. Maximum Quantity of biomasses to be burnt: 10 tonnes hour of grapes harvest and winery by-products at 1850 kcal/kg. LHV shall be in […]

AEM Gestioni Srl (2007)

Development of detailed engineering related to revamping of Cremona MSW incineration line 1 and supply of the new concept variable pressure auxiliary boiler.

A.AM.P.S. SPA (2005)

Major improvements to the thermal cycle, AAMPS Livorno MSW incineration plant.