AGSM AIM s.p.a. (2023)

Assignment for the design of a system for the drying of organic sludge (110,000 t/y) and their combustion to be implemented within the area of the old waste-to-energy plant located in Ca’ del Bue.

LEDOGA SRL – Gruppo Silvateam (2021)

The basic engineering of a new CHPP 4MWt+3MWt was to include the study of the energetic optimization of the thermal sources available to the company and the project of the distribution of the heat within theinternal industrial network.

ASA Azienda Servizi Ambientali (2019)

After a preliminary study to evaluate the co-combustion of sludge sewage and RSU-RDF in the incineration plant, W.T.E. was appointed to analyse in details the energetic performance of the plant. The aim was to verify the compliance with law and rules in force, focusing on energy recovery. The client, A.S.A.core business focuses on management of […]

ECOLOGICA NAVIGLIO Spa (2018)

Thanks to its know-how, W.T.E. was selected to deliver the study of the new control system of the existing sludge drying  plant to improve safety procedure switching from originally manual operation to an automatic one. W.T.E. also provided the related HAZOP through process analysis and management interviews. Basing on a suitable mathematical model, automation procedures were […]

ECOSESTO SPA – Falck Renewables Spa (2016)

ECOSESTO Spa asked to W.T.E. to conduct an audit on energetic performance of the biomass to energy plant (16.5 MWe) operating in Rende(Calabria) in order to improve the energy efficiency of the plant. W.T.E.’ aim was to achieve the optimisation of combustion process through increased flexibility; the final aim was to allow the combustion of […]

A2A Ambiente SpA (2016)

The client, owner of the wte plant Silla2 in Milan, appointed W.T.E. to provide a solution for the treatment of the primary air, drawn from the refuse pit of the plant. WTE designed a system in two stages. A self-cleaning filter, operating as metallic sieves, was recommended. As the plant needed a deeper cleaning system […]

GEOFOR SPA (2011)

GEOFOR Spa, owner of the incineration plant in Pisa appointed W.T.E. to study the optimization of the combustion delivering a whole control system to reduce the emission of pollutants. The plant had 2 lines, 15 MWt each, fed by MSW/RDF. The implemented logic enhances the level of quality and quantity of combustion by means of […]

VEOLIA Vercelli Energia SpA (2011)

After the start-up of the MSW incineration plant in Vercelli and some years of running, the plant management needed an additional support to optimize the combustion control system, previously delivered by W.T.E., due to the increased variability of the urban waste composition and higher heating value, caused by the spot presence of hazardous waste. Operators […]

VEOLIA- Vercelli Energia SpA (2009)

VEOLIA entrusted W.T.E. with troubleshooting the excessive CO levels in the exhaust gas, measured at the unique stack, used by three lines. The plant was owned by Vercelli Energia and managed by VEOLIA. W.T.E. designed and delivered a combustion control system, to be implemented on an existing DCS, and supplied all necessary new instruments. The […]